Steveson Remodeling of Farmers Branch

Raj's Bath

The existing bathroom is well laid out, and the lines are clean.  Unfortunately, the bulging tiles indicate there is water damage behind the wall long before any demo is done, although these pictures only suggest it.  The subsequent rebuild offers an opportunity to open and brighten the space.  This couple made the most of what space was available.  The end result is very modern and inviting.

Rahul B (2).JPG
Rahul C (2).JPG
Rahul E.JPG

We install PVC pan liners under our cement shower pans, and coat all the surfaces in water proofing membrane.  A 24 hour leak test is performed before tiling.  Everything has a double layer of waterproofing, and cement backer board as well.  Copper is used for the plumbing where ever possible.  We're here to protect your investment in your home.  

Final w glass (4).JPG